02Services
Construction
Built by our own hands
Our in-house construction division ensures the seamless delivery of every project, with full control over quality, timelines and costs.
We work across a diverse range of developments — from new-build schemes and sensitive redevelopments to the restoration of Grade II listed buildings. We deliver for both our own portfolio and for valued clients.
Because the contractor and the developer sit under one roof, accountability never changes hands. The team that promises is the team that pours the concrete.
Explore developmentsQuestions about Construction
Does Legacie build its own developments?
Yes. Our in-house construction division delivers our own portfolio and builds for clients, so the developer and the contractor sit under one roof.
What does Legacie build?
New-build schemes, sensitive redevelopments and the restoration of Grade II listed buildings, across Build to Rent, student accommodation and social housing.
Which accreditations does the construction business hold?
Legacie Contracts Limited holds ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, ISO 27001:2022, CHAS Elite, Common Assessment Standard and Constructionline Silver.
How is carbon reduced on site?
Hydrotreated vegetable oil (HVO) in place of fossil diesel in site plant, introduced at The Gateway, with generator run-time targets in every Construction Phase Plan.
Legacie track record
- Developments completed
- 20+
- Homes delivered
- 3,000
- Homes under construction
- 2,500
- Homes in the pipeline
- 3,000
Accredited
- ISO 9001:2015
- ISO 14001:2015
- ISO 45001:2018
- ISO 27001:2022
- CHAS Elite
- Common Assessment Standard
- Constructionline Silver
- Build UK
- Construction Innovation Hub
Seen in practice
Live developmentThe Gateway.
Pumpfields, Liverpool
4 Towers - 656 Apartments - (Inc 14 Townhouses)
A landmark residential development in the city’s Pumpfields district delivering 656 high-spec apartments, 5* residential amenity across four striking towers uniquely connected by a seventh-floor landscaped skybridge — a first for the city.
Live developmentHeap’s Mill.
Baltic Triangle, Liverpool
4 Blocks (Inc Grade II-listed Mill) - 527 Apartments
The Heap's Mill development is a landmark regeneration project centred on the restoration of an 18th-century Grade-II listed Mill, blending Liverpool’s rich industrial heritage with contemporary urban living.
Live developmentSoapWorks.
Pumpfields, Liverpool
381 Apartments
The latest addition set to transform the Pumpfields district, SoapWorks will offer studio, one, and two-bedroom apartments alongside exceptional residential amenities and extensive landscaped areas. Located adjacent to The Gateway development, it forms a key part of the area’s ongoing regeneration.
Live developmentWest One.
Salford, Greater Manchester
140 Apartments
West One is a cutting-edge eco-development in Salford, featuring high-spec apartments and premium amenities. Enhancing its mixed-use appeal, the site includes a separate five-storey office building with dedicated parking, ideal for modern urban living and working.
Live developmentSt. Simon Street.
Salford, Greater Manchester
42 Homes
St Simon Street, Salford is a community-led development and our first social housing scheme in Greater Manchester, delivered in partnership with MSV Housing through the Innovation Chain North framework.
Live developmentThe Old Baths.
Garston, Liverpool
74 Homes
The Old Baths is a new mixed-tenure development in Garston Village, delivering 74 affordable homes in total—27 for social rent, 12 for older people, and 35 available through a rent-to-buy scheme. It offers a range of high-quality housing options alongside spaces for local businesses. to meet the diverse needs of the Garston community.
